Waterproofing inspection in Craigieburn

The membrane inspected while it is still a membrane and not a finished floor.

  • After the membrane is applied and before any tile is laid
  • About 1 hour on site
  • Report within 24 hours
Price your Craigieburn inspectionSend the address and what you need.

Fully licensed & accredited

Stage6 of 7
When to bookAfter the membrane is applied and before any tile is laid
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Craigieburn waterproofing inspection

  • Membrane coverage across the floor and up the walls
  • Wall upturn heights at the shower and against hobs
  • Hob, threshold and step-down details
  • Bond breakers at wall and floor junctions
  • Floor waste flange bedded and sealed to the membrane
  • Falls to the floor waste and shower screed
  • Penetrations for taps, wastes and shower rails sealed
  • Membrane cure, damage and coverage before tiling
  • Primer and substrate preparation where visible
  • Set-down depth against the finished floor level
  • Junctions to baths, screens and vanities
  • Laundry, powder room and ensuite treated to the same standard
Why it matters here

Waterproofing inspections on Craigieburn builds

Wet area rectification is the most expensive defect category in a new home, because fixing it after tiling means dismantling the room. What we have recorded in Craigieburn is membrane work left simply incomplete in an ensuite, which is the version of this failure that is easiest to catch and cheapest to correct, provided somebody looks before the tiler starts.

What we find at this stage in Craigieburn

  • Membrane application incomplete in a wet area
  • Coverage stopping short of the required height
  • Bandages not embedded into the membrane coats
  • Water stop angles missing or wrongly set
  • Penetrations and outlet lugs not sealed
Mouldy sealant on an older wet area, Craigieburn
Mouldy sealant on an older wet area
Sample findings

Sample defects found during our waterproofing inspections in Craigieburn

Annotated findings from Waterproofing inspections on Craigieburn builds. Client addresses withheld.

Incomplete waterproofing to an ensuite, recorded during a fixing stage inspection in Craigieburn
Ensuite waterproofing incomplete
Further incomplete waterproofing, recorded during a fixing stage inspection in Craigieburn
A second incomplete area in the same wet area
Incomplete waterproofing recorded during a fixing stage inspection in Craigieburn
Membrane still unfinished at inspection
Sealant recommended, recorded during a building and pest inspection in Craigieburn
Sealant recommended at a wet area junction

The other stages of a Craigieburn build

  1. Bored piers inspection in Craigieburn1Bored piersAfter boring and cage placement, before any concrete
  2. Slab pre-pour inspection in Craigieburn2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Frame inspection in Craigieburn3FrameOnce frame and trusses are up and the roof is on, before lining
  4. Lock-up (pre-plaster) inspection in Craigieburn4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  5. Fixing inspection in Craigieburn5FixingAfter mouldings, doors and joinery, before the painter
  6. Pre-handover (PCI) inspection in Craigieburn7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Craigieburn →

Guides

Construction stage guides for Craigieburn

All guides →

Book a waterproofing inspection in Craigieburn

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Waterproofing inspections in Craigieburn: common questions

Which standard applies?

AS 3740 for waterproofing of domestic wet areas, read with the National Construction Code and the ABCB Housing Provisions, alongside your contract and the Guide to Standards and Tolerances.

Do you flood test?

No. Flood testing is intrusive and belongs to the waterproofer as part of their own process. We inspect visually and by hand, which is what identifies incomplete and badly detailed work.

How long is the window?

Often only a few days between the waterproofer finishing and the tiler starting. Book as soon as the waterproofer is scheduled rather than once the work is done.

What does a failure look like later?

Usually a damp skirting or a stain on the wall of the adjoining room, a year or two after you move in. By then the remedy is removing tiles and screed and starting again.

Can this be combined with the fixing inspection?

It frequently is, and on most Craigieburn builds the two run as a single visit. Where the tiler is close behind, we would rather attend separately and early.

Whose responsibility is the fix?

The builder's, as a coordination matter between the waterproofer and the tiler. The report gives them the location and the clause, which is usually enough for it to be redone before tiling.