
The brace that was cut to fit a duct
A structural element, removed by somebody who needed the space.
What our inspectors know about building, buying and owning in Craigieburn.

A structural element, removed by somebody who needed the space.

Recorded at frame stage, weeks after the pour.

Two minutes of work, deferred until it becomes a plumber's callout.

Category 2 at one to five millimetres says something. Major does not.

Below the ceiling a leak gets painted over. Above it, the stain stays.

Outdoor timber is the first thing on a house to go, and the last thing anyone budgets for.

Every bridged barrier was created by somebody trying to improve the place.

Unknown is not the same as untreated, and it is not the same as safe.

The honest answer is also the useful one.

A room that will not warm up, and a cause nobody can see.

Damage that happens during construction and is invisible from the ground.

The date you pick decides whether the list gets fixed or just acknowledged.

Most disputes are not about what is there. The fight is over whether it falls inside an allowance.

The question that decides whether cracking is a repair or a problem.

The cheapest material on the building, protecting the most expensive junctions.
Instant online pricing, or talk to the booking team on 1300 471 805.
The inspectors who attended the jobs. Every guide starts from something recorded on an actual Craigieburn report, which is why the photographs are ours rather than stock.
They are revised when a standard changes or when a finding starts recurring often enough to be worth writing down. Each carries its date.
Yes. They are written so both sides can read the same explanation without it becoming an argument about terminology.